{"id":1095,"date":"2017-02-03T09:17:53","date_gmt":"2017-02-03T09:17:53","guid":{"rendered":"http:\/\/foxthemes.com\/web\/wp\/prague.1.2.0\/?p=1095"},"modified":"2019-12-16T06:50:07","modified_gmt":"2019-12-16T06:50:07","slug":"creature-interior","status":"publish","type":"post","link":"http:\/\/www.dib.mn\/en\/?p=1095","title":{"rendered":"INTERIOR AND EXTERIOR DESIGN IMPLEMENTATION"},"content":{"rendered":"<div class=\"pixfields_box\" >\n\t<ul class=\"pixfields_list\">\n\t\t\t<li class=\"pixfield\">\n\t\t\t<strong>Company<\/strong> : com1\t\t<\/li>\n\t\t<\/ul>\n<\/div>\n<p><strong>Interior design implementation<\/strong><\/p>\n<p>Interior space planning and solution of a building is based on the client\u2019s characteristics and needs. The process involves studying of the space measuring capacity of rooms, creation of environment, concept development, consideration with modern trends, and presentation of ideas in each stage to the client in order to shape realistically assembled environment.<\/p>\n<p>Client would have a clear view of possible options of the future designs with a help of a neatly drawn interior design on a paper. Then, the client can change and reflect their ideas on the draft. It gives both stakeholders an opportunity to analyze risks and take decisions to minimize and eliminate the potential threats.<\/p>\n<p><strong>Exterior design solutions and drawing and exterior work implementation<\/strong><\/p>\n<p>Exterior designing often takes place once the construction work is finished, for a purpose of renovating the outside look of buildings. Although, in some cases, it is possible that during the construction process, client might change their mind on an approved design or request to revise the exterior design.<\/p>\n<p>Any building fa\u00e7ade and exterior work can be executed in a manner where the client\u2019s wish concept and interest are assured, neighboring buildings and environment thought through and reflected the weather conditions while ensure longevity and unique characters.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>We design a new building on Nickelodeon&#8217;s Burbank campus makes the &#8220;pages&#8221; : &#8220;The new state-of-the-art five-story glass structure will &#8230;<\/p>\n","protected":false},"author":1,"featured_media":3959,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[35],"tags":[],"class_list":["post-1095","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-company2"],"_links":{"self":[{"href":"http:\/\/www.dib.mn\/en\/index.php?rest_route=\/wp\/v2\/posts\/1095","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.dib.mn\/en\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.dib.mn\/en\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.dib.mn\/en\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/www.dib.mn\/en\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1095"}],"version-history":[{"count":8,"href":"http:\/\/www.dib.mn\/en\/index.php?rest_route=\/wp\/v2\/posts\/1095\/revisions"}],"predecessor-version":[{"id":4686,"href":"http:\/\/www.dib.mn\/en\/index.php?rest_route=\/wp\/v2\/posts\/1095\/revisions\/4686"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/www.dib.mn\/en\/index.php?rest_route=\/wp\/v2\/media\/3959"}],"wp:attachment":[{"href":"http:\/\/www.dib.mn\/en\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1095"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.dib.mn\/en\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1095"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.dib.mn\/en\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1095"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}